MecLock Safeguards
258 www.strasser-gmbh.com - sales@strasser-gmbh.com MecLock_Katalog_2025_CAT_2505-10_EN_INT Installation instructions - Tolerances and accessibility Technical Annex General installation instructions for MecLock safeguards The following aspects must be observed during installation: • The carrier frame or the foundation must have sufficient load carrying capacity and stability. • Allowable horizontal deviation per 800 mm clearance: max. 1 mm • Allowable vertical deviation per 800 mm stroke: max. 1 mm • Allowable inclination: 0° up to 30° (no inclination for angled shapes B10, B20 and B30) • Fastening holes on the carrier frame with vertical tolerance prevent a displaced vertical installation. Use long holes or fixing holes with a larger diameter (+2 mm) on the carrier frame for fastening. • Flat mounting surfaces prevent twisted horizontal installation (ensure that the mounting brackets used are perpendicular). max. 1 mm max. 1 mm
Made with FlippingBook
RkJQdWJsaXNoZXIy MTIxMzQ=